Revision a66a2a36
ID | a66a2a368383e627b929bf42d1b972822491404b |
block: introduce BLOCK_JOB_READY event
Even for jobs that need to be manually completed, management may want
to take care itself of the completion, not requiring the user to issue
a command to terminate the job. In this case we want to avoid that
they poll us continuously, waiting for completion to become available.
Thus, add a new event that signals the phase switch and the availability
of the block-job-complete command.
Signed-off-by: Paolo Bonzini <pbonzini@redhat.com>
Signed-off-by: Kevin Wolf <kwolf@redhat.com>
Files
- added
- modified
- copied
- renamed
- deleted