Automatized Upgrade Procedure for Ganeti
3
========================================
4

    
5
.. contents:: :depth: 4
6

    
7
This is a design document detailing the proposed changes to the
8
upgrade process, in order to allow it to be more automatic.
9

    
10

    
11
Current state and shortcomings
12
==============================
13

    
14
Ganeti requires to run the same version of Ganeti to be run on all
15
nodes of a cluster and this requirement is unlikely to go away in the
16
foreseeable future. Also, the configuration may change between minor
17
versions (and in the past has proven to do so). This requires a quite
18
involved manual upgrade process of draining the queue, stopping
19
ganeti, changing the binaries, upgrading the configuration, starting
20
ganeti, distributing the configuration, and undraining the queue.
21

    
22

    
23
Proposed changes
24
================
25

    
26
While we will not remove the requirement of the same Ganeti
27
version running on all nodes, the transition from one version
28
to the other will be made more automatic. It will be possible
29
to install new binaries ahead of time, and the actual switch
30
between versions will be a single command.
31

    
32
Path changes to allow multiple versions installed
33
-------------------------------------------------
34

    
35
Currently, Ganeti installs to ``${PREFIX}/bin``, ``${PREFIX}/sbin``,
36
and so on, as well as to ``${pythondir}/ganeti``.
37

    
38
These paths will be changed in the following way.
39

    
40
- The python package will be installed to ``${pythondir}/ganeti-${VERSION}``.
41
  Here ${VERSION} is the full qualified version number, consisting of
42
  major, minor, revision, and suffix. All python executables will be changed
43
  to import the correct version of the ganeti package.
44

    
45
- All other files will be installed to the corresponding path under
46
  ``${libdir}/ganeti-${VERSION}`` instead of under ``${PREFIX}``
47
  directly, where ${libdir} defaults to ${PREFIX}/lib. Symbolic links
48
  to these files will be added under ``${PREFIX}/bin``,
49
  ``${PREFIX}/sbin``, and so on.
50

    
51
As only each version itself has the authoritative knowledge of which
52
files belong to it, each version provides two executables ``install``
53
and ``uninstall`` that add and remove the symbolic links,
54
respectively. Both executables will be idempotent and only touch
55
symbolic links that are outside the directory for their version of
56
Ganeti and point into this directory. In particular, an ``uninstall``
57
of one version will not interfere with an ``install`` of a different
58
version.
59

    
60
gnt-upgrade
61
-----------
62

    
63
The actual upgrade process will be done by a new binary,
64
``gnt-upgrade``. It will take precisely one argument, the version to
65
upgrade (or downgrade) to, given as full string with major, minor, suffix,
66
and suffix. To be compatible with current configuration upgrade and downgrade
67
procedures, the new version must be of the same major version and
68
either an equal or higher minor version, or precisely the previous
69
minor version.
70

    
71
When executed, ``gnt-upgrade`` will perform the following actions.
72

    
73
- It verifies that the version to change to is installed on all nodes
74
  of the cluster that are not marked as offline. If this is not the
75
  case it aborts with an error. This initial testing is an
76
  optimization to allow for early feedback.
77

    
78
- An intent-to-upgrade file is created that contains the current
79
  version of ganeti, the version to change to, and the process ID of
80
  the ``gnt-upgrade`` process. The latter is not used automatically,
81
  but allows manual detection if the upgrade process died
82
  unintentionally. The intend-to-upgrade file is persisted to disk
83
  before continuing.
84

    
85
- The Ganeti job queue is drained, and the executable waits till there
86
  are no more jobs in the queue. Once :doc:`design-optables` is
87
  implemented, for upgrades, and only for upgrades, all jobs are paused
88
  instead (in the sense that the currently running opcode continues,
89
  but the next opcode is not started) and it is continued once all
90
  jobs are fully paused.
91

    
92
- All ganeti daemons on the master node are stopped.
93

    
94
- It is verified again that all nodes at this moment not marked as
95
  offline have the new version installed. If this is not the case,
96
  then all changes so far (stopping ganeti daemons and draining the
97
  queue) are undone and failure is reported. This second verification
98
  is necessary, as the set of online nodes might have changed during
99
  the draining period.
100

    
101
- All ganeti daemons on all remaining (non-offline) nodes are stopped.
102

    
103
- A backup of all Ganeti-related status information is created for
104
  manual rollbacks. While the normal way of rolling back after an
105
  upgrade should be calling ``gnt-upgrade`` from the newer version
106
  with the older version as argument, a full backup provides an
107
  additional safety net, especially for jump-upgrades (skipping
108
  intermediate minor versions).
109

    
110
- If the action is a downgrade to the previous minor version, the
111
  configuration is downgraded now, using ``cfgupgrade --downgrade``.
112

    
113
- The current version of ganeti is deactivated on all nodes, using the
114
  ``uninstall`` executable described earlier.
115

    
116
- The new version of ganeti is activated on all nodes, using the
117
  ``install`` executable described earlier.
118

    
119
- If the action is an upgrade to a higher minor version, the configuration
120
  is upgraded now, using ``cfgupgrade``.
121

    
122
- All daemons are started on all nodes.
123

    
124
- ``ensure-dirs --full-run`` is run on all nodes.
125

    
126
- ``gnt-cluster redist-conf`` is run on the master node. 
127

    
128
- All daemons are restarted on all nodes.
129

    
130
- The Ganeti job queue is undrained.
131

    
132
- The intent-to-upgrade file is removed.
133

    
134
- ``gnt-cluster verify`` is run and the result reported.
135

    
136

    
137
Considerations on unintended reboots of the master node
138
=======================================================
139
 
140
During the upgrade procedure, the only ganeti process still running is
141
the one instance of ``gnt-upgrade``. This process is also responsible
142
for eventually removing the queue drain. Therefore, we have to provide
143
means to resume this process, if it dies unintentionally. The process
144
itself will handle SIGTERM gracefully by either undoing all changes
145
done so far, or by ignoring the signal all together and continuing to
146
the end; the choice between these behaviors depends on whether change
147
of the configuration has already started (in which case it goes
148
through to the end), or not (in which case the actions done so far are
149
rolled back).
150

    
151
To achieve this, ``gnt-upgrade`` will support a ``--resume``
152
option. It is recommended to have ``gnt-upgrade --resume`` as an
153
at-reboot task in the crontab. If started with this option,
154
``gnt-upgrade`` does not accept any arguments. It first verifies that
155
it is running on the master node, using the same requirement as for
156
starting the master daemon, i.e., confirmed by a majority of all
157
nodes. If it is not the master node, it will remove any possibly
158
existing intend-to-upgrade file and exit. If it is running on the
159
master node, it will check for the existence of an intend-to-upgrade
160
file. If no such file is found, it will simply exit. If found, it will
161
resume at the appropriate stage.
162

    
163
- If the configuration file still is at the initial version,
164
  ``gnt-upgrade`` is resumed at the step immediately following the
165
  writing of the intend-to-upgrade file. It should be noted that
166
  all steps before changing the configuration are idempotent, so
167
  redoing them does not do any harm.
168

    
169
- If the configuration is already at the new version, all daemons on
170
  all nodes are stopped (as they might have been started again due
171
  to a reboot) and then it is resumed at the step immediately
172
  following the configuration change. All actions following the
173
  configuration change can be repeated without bringing the cluster
174
  into a worse state.
175

    
176

    
177
Caveats
178
=======
179

    
180
Since ``gnt-upgrade`` drains the queue and undrains it later, so any
181
information about a previous drain gets lost. This problem will
182
disappear, once :doc:`design-optables` is implemented, as then the
183
undrain will then be restricted to filters by gnt-upgrade.
184

    
185

    
186
Requirement of opcode backwards compatibility
187
==============================================
188

    
189
Since for upgrades we only pause jobs and do not fully drain the
190
queue, we need to be able to transform the job queue into a queue for
191
the new version. The way this is achieved is by keeping the
192
serialization format backwards compatible. This is in line with
193
current practice that opcodes do not change between versions, and at
194
most new fields are added. Whenever we add a new field to an opcode,
195
we will make sure that the deserialization function will provide a
196
default value if the field is not present.
197

    
198